Under construction (again)…

It’s springtime here at the homestead and that means the year’s big improvement projects are about to kick off. Fortunately this year’s points of main effort don’t involve the evisceration of the back yard as I’ve opted for two smaller and slightly less invasive projects this year.

Phase 1, getting underway at or around 8AM calls for removing and disposing of three relatively large white pines that are encroaching a bit too far towards the house and front yard. Bringing these guys down should improve some soggy yard issues on that corner of the house, but mostly getting rid of them was an esthetic decision. Opening up that side of the yard will dramatically improve the house’s “presence” as seen from the street. More importantly, perhaps, it will give the front two bedrooms an unobstructed view out to the stand of oaks currently hidden behind the pines. It’s nice to see that not every project on my list has to involve major feats of engineering.

In Phase 2, we move inside to brick over the basement window that has been the source of constant consternation and aggravation since I moved in. A little excavation, a little block cutting, half a dozen new cinder blocks, and a whole lot of exterior waterproofing and backfill should at least get me to the point where there isn’t a readymade pit for the water to build up in. In theory, removing the pooling water should go a long way towards remedying the problem. There are a lot of other ways we could have gone after it, but doing away with a below grade window that served absolutely no purpose felt like a no brainer. Once the basement is closed off and the window well filled in, whatever water falls should follow the new path of least resistance which is out towards the back yard instead of down towards the place where a window use to be. Not being a hydraulic engineer, that’s my operating theory anyway. Once we get the first good rain, we’ll see how well that theory pans out under real world conditions.

So that’s it. I’ll have contractors crawling all over the place tomorrow and then have two of the three big projects for the year finished. After almost a year in residence, it’s starting to feel like I’m putting my own stamp on the place.

Leave a comment