It’s been a busy week even by comparison to the last few busy weeks.
Because a lot of the ceiling had to come down to accommodate new infrastructure, a metric shit ton of insulation had come down too. The week started with blowing new insulation back into the attic. After that, the designer stopped by to pick paint and look at my unexpectedly mismatched vanity top. The consensus there was to stand pat until the paint is on the walls and fixtures are in before making a final decision. I think we’re all being overly optimistic by hoping that the paint will pull everything together, but I’ve never had a particular eye for color so I’m satisfied to just let the process work through to its logical conclusion.
If it turns out we do need to bring in a substitution, it won’t be the end of the world. Remove two fixtures, replace the existing top with a darker stone, reattach the fixtures, and get on with life. Easy to say, of course, before I have to cut another check for it. In the worst case, I’ll keep the current top stashed in the basement until the time comes to renovate the guest bathroom. That’ll have to be done eventually anyway since it seems some people are fussy about having at least one bathtub in in house. The current number of tubs here is zero and it suits me fine. Maybe it’ll be odd to have dual sinks in a guest bath, but bugger it. I’ve already paid for the damned thing.
The painter has been here for the last two days throwing his own proprietary variant of Lowes’ “Realest Greige” onto the bathroom walls giving the closet a nice coat of contractor standard white. One wall in the bedroom needed repainted due to several spots that had to be cut and patched. Doing one out of four walls wasn’t ideal, but the bedroom is probably the next room on my project list. It needs new carpet and could stand a full paintjob – both of which I was putting off until after the dust and dirt of ripping out and replacing the adjoining bathroom was behind me.
Final hook ups for plumbing and electrical are scheduled for Monday. I’ll be glad to have the giant box o’ toilet finally out of the laundry room. It’s been there for over two months now.
Even after all this, there are some punch list items left to do. The mirrors need to be hung. The towel bar and toilet paper holder need to be mounted. A final bead of caulk needs to be run around the top of the shower tile now that the ceiling is painted. With the paint done I can reinstall the blinds and recycle a valance to hide those mechanicals at least temporarily. I’ve also got a small set of shelves I’ll be pressing into service as storage until I stumble across a more permeant storage piece. The shower glass, of course, remains on backorder. But other than that, this project is done.
So, you see, “done” is a matter of degree.
I suspect I’ll jump the gun and start moving back into the bedroom over the weekend. The temptation to sleep in my own bed after two months across the hall is just too strong to be foiled by whatever additional dirt and grime the electricians and plumbers might kick up next week. How that goes will depend entirely on giving everything a good cleaning. Even with everything swaddled in plastic, tarps, and drop cloths, construction dust seems to be inescapable. Once I get it to a serviceable level of clean, I’m inclined to go ahead and hire someone to really give the whole place a going over from top to bottom. I’ve done a reasonable job to keep the mess from spreading to the rest of the house, but really getting things back up to standard is going to take a level of effort.
That’s it. That’s the update. The end is tantalizingly close and still feels incredibly far away.