Monday was the only working day on the project this week. The electricians were here making final hook ups in the morning and the plumbers ate up the afternoon installing all the fixtures. For all practical purposes, I have a working bathroom… That I still can’t quite use yet.

The punch list I’m tracking includes hanging the mirrors, caulking the vanity top, around the top of the shower tile, and all the fixtures, installing a towel bar and toilet paper holder, and addressing an odd leak from the handheld shower that only seems to happen momentarily when the flow is diverted back to the main showerhead. There’s also the backlogged glass panel that needs to be installed before I can properly use the shower without water logging the rest of the room. None of that includes the more mundane things that need doing – like picking a trash can and replacing the builder grade shower head.

I have, at least, moved back into my own bedroom. Sleeping in your own bed after being displaced for two months is a real pleasure. With the painting down and the shelving back, I’ve even started using my master closet instead of having thing split between three other closets and one large pile in the middle of the room where George the tortoise lives. The missing seven square feet is surprisingly noticeable, but I don’t regret giving it up to get more space for the shower. I still want to rework some of that space, maybe add some stacked shelving in addition to the current long racks. There’s enough left-over parts and pieces from what needed to be removed that I can probably fashion something to suit with just one or two trips to Lowe’s. Failing that, a drive down to Ikea will get me there for a few dollars more.

With paint on the walls and all the fixtures in, I still don’t love the colors I picked out for the vanity and top. I have, however, decided they’re good enough to not be able to justify tearing things out immediately. Soon enough, the guest bath is on the list for its own upgrade, so they’ll eventually find a home across the hall when I bring in something else.

The list to drag this project, limping, across the finish line is relatively short, but since we’ve now exceeded the original project timeline by more than 100%, I’m increasingly eager to have the last bits finished off. After it being an almost completely useless room for the last seven years, I’m impatient for it to start being something to use instead of just for looking at as an ongoing curiosity. 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s