The Bathroom Report: Day 96

Yesterday I got a fancy yellow sticker from the county building inspector signifying that the job is complete.

I’m not entirely sure what he inspected. He certainly didn’t turn any nobs or flip any switches. He didn’t go to the basement to check anything. But he was here and I have a sticker and I guess that’s the important part.

We may be finished in the eyes of the county, but there remains a small hitch. The shower floor – all 35 square feet of it – was carefully sloped in the general direction of the drain. It was almost bang on except for the part where the lip of the drain grate is approximately 1/16th of an inch higher than the surrounding tile. The end result is a shallow puddle of water that collects around the drain and then sits there for 18-24 hours. How long it stays there seems to depend largely on the relative humidity in the house more than anything else. In any case, it feels like a long-term invitation to mold issues and grout problems if it’s allowed to continue year after year.

After giving it a look over, the builder agrees that it needs to be addressed, so at some point in the near future I’ll have another appointment with the tile guy who can hopefully resolve the issue with a combination of dremeling and  building up grout immediately surrounding the drain to bring things flush. After that, this project should be well and truly complete.

Until then, the saga continues.

The Bathroom Report: Day 40

Seeing it fully tiled for the first time, I can honestly say that while the shower is still abnormally large, it no longer feels absurdly so. I think when, eventually, the glass gets installed, it will feel like a properly enclosed space. Given the lead time quoted by the glass company, though, it could be a while before I get to make a final determination on that. I was skeptical about both the design and the tile choices originally, but seeing them all hanging together versus laid out on just a sample palette, I’m well pleased with where it’s heading.

The crew here started in on the floor yesterday. Once they get to the point of laying that tile, it should be a straight forwarded running bond pattern covering a simple rectangle. With no oddball angles to contend with, I’m cautiously optimistic that it’ll go quickly. Of course, before they could start on the tile, the heating element needed to be fitted…. and that, of course, is where we encountered this week’s catch.

The heating cable that arrived weeks ago when the materials were delivered turned out to be about half the length they actually needed for the job. Most of what they did yesterday has to come out so that can be corrected. With that, instead of getting the floor most of the way done, they’ve shifted gears to work on grouting the shower tile while waiting for the right cable to show up. That’s fine. It’s still necessary progress. God knows there’s enough grout work that needs doing.

I’m not sure if you’d call it a design feature, but one small thing I insisted on is leaving a 24”x24” corner section of the floor unheated. Since moving in to this house, the master bathroom was almost exclusively a place to keep the litter box. I haven’t decided yet if I’ll move the box back into the bathroom or leave it where it’s been during construction, but in the event it does someday move back into its old space, having a bit of the floor that wouldn’t act like a hot plate under it felt like just good sense. No matter how good a room looks, heated cat pee feels like something best avoided.

I’m not yet willing to call the beginning of the end, but it seems to me that we’re well past the end of the beginning. Once the floor is in and the grout is done, I have to believe we’re in the home stretch. Then it’s moving in the vanity, painting, making the final plumbing connections, and fixtures and finishing touches. It’s still a lot… but a lot less than it was a while ago. 

Home improvement…

There is something unquestionably satisfying about working with your hands. Given the long weekend and the distinct lack of classes at the moment, I was able to take on a bit project I’ve wanted to do for the last few months. For my first attempt at doing tile work, it turned out much better than I expected… and only involved four trips to Lowe’s in the last three days.