There is nothing significant to report. The project remains at a pause pending a few final bits and bobs. The mirrors, a towel rack, and the toilet paper holder remain uninstalled. The connection for the handheld shower head has an odd leak/surge when the diverter is closed. Last, but certainly not least, the 4’x4′ piece of glass that I’ll need in order to keep the rest of the room dry while the shower is running remains “ordered.”
We’re over the projected timeline by a factor of 2.25 now. At least the project managed to stay on budget.
As a direct result of this little bathroom project of mine, I’ve really begun to question my long held dream of having the final homestead built from the ground up. The level of aggravation this one room has caused makes me question whether I could get through a new house build without having a stroke and heart attack simultaneously.