Bathroom report supplemental…

Two weeks ago, the plumbers that installed the works for my new bathroom were back to correct the mysterious problem of the shower handle that wouldn’t stay attached no matter how much or often the set screw was tightened down. To my mind it still feels flimsy, but to their credit it has stayed attached after their visit. If it breaks again, I’ll surely just call my own choice of plumbers to get after it rather than the guys who are subcontracted to the builder who did the renovation work.

The repair work for the handle involved some disassembly, a lot of fiddling around with the valve and stem, and reassembly to something that gave all appearances of working correctly.

About a day after that work was done, however, I noticed a steady, slow drip from the shower head. I’m not saying the two are necessarily connected, but one started immediately after the other was “fixed,” so I do have my suspicions.

I notified the plumbers that there was an issue a week ago today. So far it’s been radio silence. I just assume that’s going to mean yet another round of getting the prime contractor involved (again) in order to get anything done and the glaciated pace of everything involved in the last half of putting this bathroom together. I suspect the only reason he’s even remotely interested is his tile guy remains on the hook to come in and tweak a little bit of slope around the shower drain… which can’t happen until the steady trickle of water is stopped and they’ve got a nice dry floor to work with.

Truly this is the project without fucking end.

The Bathroom Report: Day 89

The Before (c. 2000)

The contractors arrived as scheduled at 8:30 this morning and set to work hanging the last of the hardware and caulking every fixture. After about 30 minutes the lead man for the day poked his head into the office and inquired where he could find the mirrors that they were supposed to hang. 

That’s a problem only in the sense that the last time the mirror frames were discussed, they were being delivered to the shop that was supposed to put the glass in them. That was near on six weeks ago and I haven’t given them another thought – in the assumption that they were being stored by the contractor temporarily with the rest of the hardware that was going in today. 

In any case, the mirrors weren’t here. And they weren’t in the small stack of stuff the contractors brought with them. And that triggered a flurry of texts between the contractors and their home office while they, I presume, tried to figure out where the missing mirrors actually were. 

In the end, the lost was found… after someone from the office stopped by the glass shop and took an unplanned 45-minute drive up from Middletown to the Elk Neck. There was a bit of additional delay as they then had to schlep over to Lowe’s since no one along the line had realized they’d also need mounting hardware. 

As I’m writing this, the contractors have departed for what, hopefully, will be the last time. The hardware is hung. The mirrors are up. Everything that was supposed to be caulked has been treated to a generous helping of silicone. After that gets 24 hours to dry, it looks like I’ll have a fully functional, dedicated master bathroom for the first time since 2011, when I ran screaming from Tennessee. All that’s left is moving all the bits and pieces from the guest bath over into the new space. I expect I’ll be taking a middle of the day shower tomorrow just because. 

The After (c. 2022)

I won’t pretend to be surprised that this project ended with one last stick in the spokes. I signed the contract on this effort back on September 9, 2021. Thanks to COVID related backorders and labor shortages, work didn’t kick off until May 25th, 2022. Here we are on August 19th, struggling right to the end. Except it’s not the end, of course. Not really. There’s still final plumbing inspection to go through next week and final, final inspection on a date yet to be determined. On and on it goes.

Even with the time involved and the absurd expense, I don’t regret the decision to tear this bathroom back to the studs and cause it to be built back to suit my needs. The final product is near enough to what I wanted to not quibble over one or two minor points of detail. It has, however, been the most significant home improvement project I’ve ever signed off on and it has been an eye-opening experience in a multitude of ways.

Having been thus enlightened, it’ll be a good long while before I want to set off on another quest like this… which is exactly why I’m trying not to think about eventually needing to change up the other bathroom so that there’s at least one bathtub in the house… and that the kitchen really could be freshened up with new countertops and flooring. The list is never ending, but I expect after this year of improving interior fit and finish, the next little while will be occupied by taking a hard look at upgrading the now 22-year-old cooling system and starting to plan for a new roof. 

The joy of home ownership continues.

The Bathroom Report: Day 82

We held the “pre-completion” conference on Tuesday afternoon. It basically consisted of the project manager stopping by so I could point at the things I had already told them via email last week. The net result is that I once again confirmed that the toilet paper holder, towel rod, and mirrors need to be installed. The backsplash, top of the shower tile, and shower dress plates all need to have silicone caulk applied. Finally, I confirmed again that the hand-held shower leaks at the supply tie in. I’ve lost track if this is the second or third week of repeating these few items.

The PM took his notes and pictures back to the office to confer with the scheduler, and theoretically work up a final schedule to finish off this project. The plumber, to his credit, was here the very next day and checked his items off the list. That just leaves the guy who does the silicone and hangs the hardware.

You wouldn’t think knocking off what’s maybe an hour’s work would drag into the 3rd or 4th week, but here we are. I’ll concede that calling it a 30-day project was probably over optimistic at the start, but the fact that we’re now running hard towards day 90 feels awfully excessive. With a little more project management, this effort could have been done, finished, and over in sixty days even allowing for the two week delay caused by the county’s johnny-on-the-spot inspection regime.

As of early this afternoon, the contractor says they’ll have the work finished next Friday morning, so we’ll give it another seven days from here. Maybe I’ll be able to report the mission accomplished next week when I post the update for Project Day 89. Even then it’ll have an asterisk because being well and truly “accomplished” will also depend entirely on the final county inspection.

If it feels like I’ve completely lost patience with this project, rest assured it’s because I have.

The Bathroom Report: Day 75

When I started this series of posts back in May, I really wouldn’t have guessed I’d still be writing them 75 days later… and yet here we are. If some past weeks went forward in leaps and bounds, progress now feels like it’s measured in fractions of an inch.

I did get to commemorate the 75th day of bathroom remodeling by seeing the last “major” item knocked off the list of things that still need installed. The 4’ x 4’ piece of glass that should, theoretically, keep most of the shower spray contained inside the shower got dropped into place around 8:45 this morning. After a 24-hour waiting period for the silicone to set, the house will have a working master shower for the first time in its 22-year history. As far as I’m concerned, it’s a hell of a big upgrade from the super-sized, dust collecting tub the last guy thought should dominate the room.

It’s still not quite a fully functional bathroom yet, though. The prime contractor needs to come back to put in a towel bar and toilet paper holder. Two mirrors still need to be hung. There’s a fair amount of caulking that still needs done on the vanity and shower fixtures. The hand-held shower’s connection to the supply line still needs tinkered with to stop a rather annoying “belch” of water from coming out of the joint when the diverter is cut over from the hand held back to the main.

Maybe, if I’m lucky, it means just one more visit from the contractor and this endeavor will be finished. I suppose I could spend every day hectoring them about getting the last of the work scheduled, but since I’m holding the last quarter payment until work is finished and accepted, I suppose they’ll be calling me sooner rather than later.

The Bathroom Report: Day 68

There is nothing significant to report. The project remains at a pause pending a few final bits and bobs. The mirrors, a towel rack, and the toilet paper holder remain uninstalled. The connection for the handheld shower head has an odd leak/surge when the diverter is closed. Last, but certainly not least, the 4’x4′ piece of glass that I’ll need in order to keep the rest of the room dry while the shower is running remains “ordered.”

We’re over the projected timeline by a factor of 2.25 now. At least the project managed to stay on budget.

As a direct result of this little bathroom project of mine, I’ve really begun to question my long held dream of having the final homestead built from the ground up. The level of aggravation this one room has caused makes me question whether I could get through a new house build without having a stroke and heart attack simultaneously.

Men plan and the gods laugh…

My annual birthday week book buying spree was interrupted, as you know, by the long-awaited master bathroom remodeling project. At the time, I pinned my hopes to get back to the world of dusty, mote filled shops during the next block of leave I usually take during the first week of July. Then, of course, there was the repeated county inspection fiasco that set us back by a matter of weeks. 

That sad story brings us to where we are now – the first week of July – when I once again have vast sweeps of unallocated time that I planned to use for chasing books. Here, I am, though, tethered to the house while work in the bathroom continues.

This summer won’t go down in my personal history as the best use of vacation time I’ve ever experienced. Given how many small change decisions it’s helpful to be able to discuss and make on the spot, the only real alternative was to cancel out my leave this week and log in for another session of working from home. That thought was even less enticing than just pissing away 4 days of leave doing piddling odds and ends around the house. 

After last week’s water system blowout, I’d be wildly uncomfortable being away for any real length of time. I’ve snuck away for a few appointments during this process – those that have taken months to get and that changing ranked as too hard to do – but otherwise I’ve been able to be here throughout. As this effort drags on, though, I increasingly wonder about the sanity of anyone who stays in their home through a more involved renovation that isn’t just contained to one room.

I’m sure at some point this week, I’ll scour a few of the online shops I frequent, just to scratch the acquisition itch. Otherwise, it looks like a week of reprising those distant times of puppy training when all the creatures of the household piled into the kitchen. I suppose, spending a few days huddled up with books, tea, and furry critters isn’t really the worst bit of vacation time I’ve ever spent… but it wasn’t at all what I had planned.

The Bathroom Report: Day 33

It’s the end of another week here at the endless bathroom project. OK, that’s maybe an exaggeration, but it sure feels that way. I assume it’s because we’re now counting days past the originally scheduled finish date and the end still isn’t in sight. 

The end may not be in sight, but there has been some solid progress made this week. The DITRA membrane is on the floor and the shower is (partially) tiled. The tile work has been slow going. I’m told that fitting the pebble floor and some of the angled bits of the first course of wall tile needed to accommodate the long slope of the shower pan took a bit of doing, but it’s in and the first coat of darkener is on it. The crew is plugging away at it, though, so it’s daily visible progress if nothing else. Plus, given the vague memory of my one long ago experience in installing a tile kitchen backsplash, that was considerably less involved than what they’re working on, I’m perfectly happy to let them contend with it.

I’ve mostly given up on projecting when I think this will be finished. I know getting the tile done is the longest pole of this particular tent. The rest – dropping in the vanity and the plumbing and lighting fixtures – should go (theoretically) quickly. That’s what I’ll keep telling myself. It should help to stave off the madness.

The Bathroom Report: Day 19

Good news… The county has signed off on the rough electric, which is nice, I suppose. The plumbers were back today to correct two incredibly nitnoid items their inspector found. Otherwise, as we arrive at the end of third full week of this project, it feels like the process involves a lot more down time than actual work. As I read the schedule, we’re now about a week behind the original plan.

Maybe I just notice it more because as we trundle on towards the one month mark, I’m ready to get out of the guest room and back into my own bed. Sure, the new arrangement has developed its own rhythm, but I’d very much like the old one back sooner rather than later. 

The county is supposed to be back to re-inspect the now new and improved rough plumbing on Monday. I assume once that’s happened, the pace will pick back up again. Yes, I know that patience is an alleged virtue, but after eight months of waiting to begin and now closing in on the end of a month of work in progress, I really just want to take a damned shower and have whole sections of the house that aren’t closed off, tarped, and being used for storage. Plus, not having a parade of perfect strangers wandering in and through the house every day will be a nice perk too.

A trip to Disney it ain’t…

The first week of June is usually the point in the year where I start taking time off in bulk. The first half of the year is for slogging through. The back half is for maximizing days not tethered to a desk or laptop. Historically, this is a week allocated for sweeping through antique and book shops ranging from Philadelphia to DC. After two years of Plague measures, 2022 was supposed to be a return to normalcy. Except, of course, that’s not how it has turned out. At least not for this week.

With a team of plumbers, carpenters, and electricians crawling around and under the house, stretching my legs like that is off the table this year. Sure, they’re bonded and insured and I’ve got cameras keeping an unblinking eye on everything, so I don’t strictly need to be here. Still, it looks like I’ll mostly be spending the week knocking around the house if only to answer random questions as they come up.

It’s not an ideal week of vacation, but after seven months of waiting to start, I certainly wasn’t going to delay further in the name of saving a cherished early summer tradition. Besides, I’ve got another tranche of time off coming up for the first week of July. This whole thing has been a bit of an exercise in delayed gratification. Why shouldn’t this be as well?

Fortunately, I’ve got a wall full of books I’ve been meaning to read and a list of odds and ends that need doing but never quite make it to the top of the list. There’s no time like the present to get after those things. Quite a few of those items got lined through today. If it all gets too tedious, I can always forgo a few vacation days, log in for telework during the tail end of the week. That feels like he worst possible option, but one never knows.

We’ll see how everything looks after a few days of just hanging out while other people stream in and out doing the heavy lifting for the week.