The Bathroom Report: Day 89

The Before (c. 2000)

The contractors arrived as scheduled at 8:30 this morning and set to work hanging the last of the hardware and caulking every fixture. After about 30 minutes the lead man for the day poked his head into the office and inquired where he could find the mirrors that they were supposed to hang. 

That’s a problem only in the sense that the last time the mirror frames were discussed, they were being delivered to the shop that was supposed to put the glass in them. That was near on six weeks ago and I haven’t given them another thought – in the assumption that they were being stored by the contractor temporarily with the rest of the hardware that was going in today. 

In any case, the mirrors weren’t here. And they weren’t in the small stack of stuff the contractors brought with them. And that triggered a flurry of texts between the contractors and their home office while they, I presume, tried to figure out where the missing mirrors actually were. 

In the end, the lost was found… after someone from the office stopped by the glass shop and took an unplanned 45-minute drive up from Middletown to the Elk Neck. There was a bit of additional delay as they then had to schlep over to Lowe’s since no one along the line had realized they’d also need mounting hardware. 

As I’m writing this, the contractors have departed for what, hopefully, will be the last time. The hardware is hung. The mirrors are up. Everything that was supposed to be caulked has been treated to a generous helping of silicone. After that gets 24 hours to dry, it looks like I’ll have a fully functional, dedicated master bathroom for the first time since 2011, when I ran screaming from Tennessee. All that’s left is moving all the bits and pieces from the guest bath over into the new space. I expect I’ll be taking a middle of the day shower tomorrow just because. 

The After (c. 2022)

I won’t pretend to be surprised that this project ended with one last stick in the spokes. I signed the contract on this effort back on September 9, 2021. Thanks to COVID related backorders and labor shortages, work didn’t kick off until May 25th, 2022. Here we are on August 19th, struggling right to the end. Except it’s not the end, of course. Not really. There’s still final plumbing inspection to go through next week and final, final inspection on a date yet to be determined. On and on it goes.

Even with the time involved and the absurd expense, I don’t regret the decision to tear this bathroom back to the studs and cause it to be built back to suit my needs. The final product is near enough to what I wanted to not quibble over one or two minor points of detail. It has, however, been the most significant home improvement project I’ve ever signed off on and it has been an eye-opening experience in a multitude of ways.

Having been thus enlightened, it’ll be a good long while before I want to set off on another quest like this… which is exactly why I’m trying not to think about eventually needing to change up the other bathroom so that there’s at least one bathtub in the house… and that the kitchen really could be freshened up with new countertops and flooring. The list is never ending, but I expect after this year of improving interior fit and finish, the next little while will be occupied by taking a hard look at upgrading the now 22-year-old cooling system and starting to plan for a new roof. 

The joy of home ownership continues.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s